The construction works of the 1.319-kilometer pipeline, estimated to cost about $2.6 billion, are planned to set out between 2011 and 2013. The singing of the ministerial declaration is in the framework of the Forum „South East Europe – Energy Bridge between the Russian Federation, Mediterranean, Caspian and Central European Region and the European Union”. (mrt.com.mk)