The line and connecting points were built at a cost of Ft 14 billion. The switching system in Győr will allow for cross-border capacity between Hungary and Slovakia to rise from 1,000 MW to 1,300 MW, Tari said. With the new 90-kilometer section, the length of Hungary’s high-voltage network will exceed 2,000 kilometers, he said.